Zpět na reference
Havřice · 2025
BESS Havřice
1,290 kWh / 625 kW
Výzva
A large industrial site needed a robust and scalable system.
Řešení
Flagship project with multiple cabinets and strong operational oversight.
Výsledky
Stable load, better peak control and higher energy security.
Capacity
1.29 MWh
Power
625 kW
Focus
Industrial control
